default search action
Ji-Bo Wang
Person information
Refine list
refinements active!
zoomed in on ?? of ?? records
view refined list in
export refined list as
showing all ?? records
2020 – today
- 2024
- [j114]Yifu Feng, Zonghai Hu, Rui Si, Ji-Bo Wang:
Study on Due-Date Assignment Scheduling with Setup Times and General Truncated Learning Effects. Asia Pac. J. Oper. Res. 41(1): 2350006:1-2350006:16 (2024) - [j113]Weidong Lei, Linhui Sun, Na Ren, Xue Jia, Ji-Bo Wang:
Research on Delivery Times Scheduling with Sum of Logarithm Processing Times-Based Learning Effect. Asia Pac. J. Oper. Res. 41(2): 2350014:1-2350014:13 (2024) - [j112]Ji-Bo Wang, Yi-Chun Wang, Congying Wan, Dan-Yang Lv, Lei Zhang:
Controllable Processing Time Scheduling with Total Weighted Completion Time Objective and Deteriorating Jobs. Asia Pac. J. Oper. Res. 41(3): 2350026:1-2350026:24 (2024) - [j111]Xiao-Yuan Wang, Dan-Yang Lv, Ping Ji, Na Yin, Ji-Bo Wang, Jin Qian:
Single machine scheduling problems with truncated learning effects and exponential past-sequence-dependent delivery times. Comput. Appl. Math. 43(4): 194 (2024) - [j110]Ming-Hui Li, Dan-Yang Lv, Zheng-Guo Lv, Li-Han Zhang, Ji-Bo Wang:
A two-agent resource allocation scheduling problem with slack due-date assignment and general deterioration function. Comput. Appl. Math. 43(4): 229 (2024) - [j109]Rong-Rong Mao, Dan-Yang Lv, Na Ren, Ji-Bo Wang:
Supply chain scheduling with deteriorating jobs and delivery times. J. Appl. Math. Comput. 70(3): 2285-2312 (2024) - [j108]Ming-Hui Li, Dan-Yang Lv, Li-Han Zhang, Ji-Bo Wang:
Permutation flow shop scheduling with makespan objective and truncated learning effects. J. Appl. Math. Comput. 70(4): 2907-2939 (2024) - [j107]Yifu Feng, Xin-Na Geng, Dan-Yang Lv, Ji-Bo Wang:
Scheduling jobs with general linear deterioration to minimize total weighted number of late jobs. Optim. Lett. 18(5): 1217-1235 (2024) - 2023
- [j106]Fei Teng, Si-Wen Luo, Dan-Yang Lv, Ji-Bo Wang:
Approaches to Solving Scheduling with Due-Window Assignment and Deterioration Effects. Asia Pac. J. Oper. Res. 40(2): 2250022:1-2250022:18 (2023) - [j105]Na Ren, Ji-Bo Wang, Ershen Wang:
Research on delivery times scheduling with truncated learning effects. Comput. Appl. Math. 42(6): 243 (2023) - [j104]Lei Pan, Xinyu Sun, Ji-Bo Wang, Li-Han Zhang, Dan-Yang Lv:
Due date assignment single-machine scheduling with delivery times, position-dependent weights and deteriorating jobs. J. Comb. Optim. 45(4): 100 (2023) - [j103]Wei Wu, Dan-Yang Lv, Ji-Bo Wang:
Two Due-Date Assignment Scheduling with Location-Dependent Weights and a Deteriorating Maintenance Activity. Syst. 11(3): 150 (2023) - 2022
- [j102]Ji-Bo Wang, Jing Xue, Bo Cui, Ming Gao:
Single-Machine Scheduling Problems with Variable Processing Times and Past-Sequence-Dependent Delivery Times. Asia Pac. J. Oper. Res. 39(2): 2150013:1-2150013:18 (2022) - [j101]Xiaoli Zhao, Jian Xu, Ji-Bo Wang, Lin Li:
Bicriteria Common Flow Allowance Scheduling with Aging Effect, Convex Resource Allocation, and a Rate-Modifying Activity on a Single Machine. Asia Pac. J. Oper. Res. 39(5): 2150046:1-2150046:21 (2022) - [j100]Ji-Bo Wang, Si-Han Wang, Kaipeng Cao, Mengqi Liu, Xue Jia:
Due-Window Assignment Methods and Scheduling with Generalized Positional-Dependent Weights. Asia Pac. J. Oper. Res. 39(5): 2250028:1-2250028:19 (2022) - [j99]Xue Jia, Dan-Yang Lv, Yang Hu, Ji-Bo Wang, Zhi Wang, Ershen Wang:
Slack Due-Window Assignment Scheduling Problem with Deterioration Effects and a Deteriorating Maintenance Activity. Asia Pac. J. Oper. Res. 39(6): 2250005:1-2250005:16 (2022) - [j98]Ji-Bo Wang, Li-Han Zhang, Zheng-Guo Lv, Dan-Yang Lv, Xin-Na Geng, Xinyu Sun:
Heuristic and exact algorithms for single-machine scheduling problems with general truncated learning effects. Comput. Appl. Math. 41(8) (2022) - [j97]Ji-Bo Wang, Xue Jia, Jia-Xuan Yan, Si-Han Wang, Jin Qian:
Single machine group scheduling problem with makespan objective and a proportional linear shortening. RAIRO Oper. Res. 56(3): 1523-1532 (2022) - 2021
- [j96]Dan-Yang Lv, Ji-Bo Wang:
Study on Resource-Dependent No-Wait Flow Shop Scheduling with Different Due-Window Assignment and Learning Effects. Asia Pac. J. Oper. Res. 38(6): 2150008:1-2150008:23 (2021) - [j95]Dan-Yang Lv, Si-Wen Luo, Jing Xue, Jing-Xiao Xu, Ji-Bo Wang:
A note on single machine common flow allowance group scheduling with learning effect and resource allocation. Comput. Ind. Eng. 151: 106941 (2021) - [j94]Wanlei Wang, Jian-Jun Wang, Ji-Bo Wang:
Solution Algorithms for Single-Machine Group Scheduling with Learning Effect and Convex Resource Allocation. Complex. 2021: 6615824:1-6615824:13 (2021) - [j93]Li-Yan Wang, Mengqi Liu, Ji-Bo Wang, Yuan-Yuan Lu, Wei-Wei Liu:
Optimization for Due-Date Assignment Single-Machine Scheduling under Group Technology. Complex. 2021: 6656261:1-6656261:9 (2021) - [j92]Ji-Bo Wang, Dan-Yang Lv, Jian Xu, Ping Ji, Fuqiang Li:
Bicriterion scheduling with truncated learning effects and convex controllable processing times. Int. Trans. Oper. Res. 28(3): 1573-1593 (2021) - [j91]Ji-Bo Wang, Bo Cui, Ping Ji, Weiwei Liu:
Research on single-machine scheduling with position-dependent weights and past-sequence-dependent delivery times. J. Comb. Optim. 41(2): 290-303 (2021) - [j90]Dan-Yang Lv, Ji-Bo Wang:
Study on proportionate flowshop scheduling with due-date assignment and position-dependent weights. Optim. Lett. 15(6): 2311-2319 (2021) - [j89]Li-Yan Wang, Xue Huang, Wei-Wei Liu, Yu-Bin Wu, Ji-Bo Wang:
Scheduling with position-dependent weights, due-date assignment and past-sequence-dependent setup times. RAIRO Oper. Res. 55(Supplement): S2747-S2758 (2021) - 2020
- [j88]Xue Huang, Na Yin, Weiwei Liu, Ji-Bo Wang:
Common Due Window Assignment Scheduling with Proportional Linear Deterioration Effects. Asia Pac. J. Oper. Res. 37(1): 1950031:1-1950031:15 (2020) - [j87]Christos A. Nicolaou, Ian A. Watson, Mark Lemasters, Thierry Masquelin, Ji-Bo Wang:
Context Aware Data-Driven Retrosynthetic Analysis. J. Chem. Inf. Model. 60(6): 2728-2738 (2020) - [j86]James A. Lumley, Prashant V. Desai, Ji-Bo Wang, Suntara Cahya, Hongzhou Zhang:
The Derivation of a Matched Molecular Pairs Based ADME/Tox Knowledge Base for Compound Optimization. J. Chem. Inf. Model. 60(10): 4757-4771 (2020)
2010 – 2019
- 2019
- [j85]Weiwei Liu, Chong Jiang, Ji-Bo Wang, Yuan-Yuan Lu:
Single-machine scheduling with simultaneous considerations of resource allocation and deteriorating jobs. Comput. J. 62(1): 81-89 (2019) - [j84]Yu Ti, Ming Xu, Chong Jiang, Ji-Bo Wang, Xiao-Yuan Wang:
No-wait resource allocation flowshop scheduling with learning effect under limited cost availability. Comput. J. 62(1): 90-96 (2019) - [j83]Xinyu Sun, Xin-Na Geng, Ji-Bo Wang, Feng Liu:
Convex resource allocation scheduling in the no-wait flowshop with common flow allowance and learning effect. Int. J. Prod. Res. 57(6): 1873-1891 (2019) - [j82]Ji-Bo Wang, Feng Liu, Jian-Jun Wang:
Research on m-machine flow shop scheduling with truncated learning effects. Int. Trans. Oper. Res. 26(3): 1135-1151 (2019) - [j81]Xi-Xi Liang, Bo Zhang, Ji-Bo Wang, Na Yin, Xue Huang:
Study on flow shop scheduling with sum-of-logarithm-processing-times-based learning effects. J. Appl. Math. Comput. 61(1-2): 373-388 (2019) - [j80]Ian A. Watson, Ji-Bo Wang, Christos A. Nicolaou:
A retrosynthetic analysis algorithm implementation. J. Cheminformatics 11(1): 1:1-1:12 (2019) - [j79]Yadi Zhou, Suntara Cahya, Steven A. Combs, Christos A. Nicolaou, Ji-Bo Wang, Prashant V. Desai, Jie Shen:
Exploring Tunable Hyperparameters for Deep Neural Networks with Industrial ADME Data Sets. J. Chem. Inf. Model. 59(3): 1005-1016 (2019) - 2018
- [j78]Ji-Bo Wang, Lin Li:
Machine Scheduling with Deteriorating Jobs and Modifying Maintenance Activities. Comput. J. 61(1): 47-53 (2018) - [j77]Ji-Bo Wang, Xin-Na Geng, Lu Liu, Jian-Jun Wang, Yuan-Yuan Lu:
Single Machine CON/SLK Due Date Assignment Scheduling with Controllable Processing Time and Job-dependent Learning Effects. Comput. J. 61(9): 1329-1337 (2018) - [j76]Ji-Bo Wang, Lu Liu, Jian-Jun Wang, Lin Li:
Makespan minimization scheduling with ready times, group technology and shortening job processing times. Comput. J. 61(9): 1422-1428 (2018) - [j75]Ji-Bo Wang, Jian Xu, Jing Yang:
Bicriterion Optimization for Flow Shop with a Learning Effect Subject to Release Dates. Complex. 2018: 9149510:1-9149510:12 (2018) - [j74]Lin Li, Ping Yan, Ping Ji, Ji-Bo Wang:
Scheduling jobs with simultaneous considerations of controllable processing times and learning effect. Neural Comput. Appl. 29(11): 1155-1162 (2018) - 2017
- [j73]Hongyu He, Mengqi Liu, Ji-Bo Wang:
Resource constrained scheduling with general truncated job-dependent learning effect. J. Comb. Optim. 33(2): 626-644 (2017) - 2016
- [j72]Christos A. Nicolaou, Ian A. Watson, Hong Hu, Ji-Bo Wang:
The Proximal Lilly Collection: Mapping, Exploring and Exploiting Feasible Chemical Space. J. Chem. Inf. Model. 56(7): 1253-1266 (2016) - [j71]Woong-Hee Shin, Charles Christoffer, Ji-Bo Wang, Daisuke Kihara:
PL-PatchSurfer2: Improved Local Surface Matching-Based Virtual Screening Method That Is Tolerant to Target and Ligand Structure Variation. J. Chem. Inf. Model. 56(9): 1676-1691 (2016) - [j70]Yuan-Yuan Lu, Jian Jin, Ping Ji, Ji-Bo Wang:
Resource-dependent scheduling with deteriorating jobs and learning effects on unrelated parallel machine. Neural Comput. Appl. 27(7): 1993-2000 (2016) - 2015
- [j69]Yu-Ping Niu, Long Wan, Ji-Bo Wang:
A Note on Scheduling Jobs with Extended Sum-of-Processing-Times-Based and Position-Based Learning Effect. Asia Pac. J. Oper. Res. 32(2): 1550001:1-1550001:12 (2015) - [j68]Limin Wang, Jian Jin, Ji-Bo Wang, Ping Ji:
Research on scheduling problems with general effects of deterioration and learning. Inf. Sci. 307: 89-94 (2015) - [j67]Cen Gao, Nels Thorsteinson, Ian A. Watson, Ji-Bo Wang, Michal Vieth:
Knowledge-Based Strategy to Improve Ligand Pose Prediction Accuracy for Lead Optimization. J. Chem. Inf. Model. 55(7): 1460-1468 (2015) - 2014
- [j66]Yuan-Yuan Lu, Jian-Jun Wang, Ji-Bo Wang:
Single machine group scheduling with decreasing time-dependent processing times subject to release dates. Appl. Math. Comput. 234: 286-292 (2014) - [j65]Ji-Bo Wang, Ming-Zheng Wang:
Single-Machine Due-Window Assignment and Scheduling with Learning Effect and Resource-Dependent Processing Times. Asia Pac. J. Oper. Res. 31(5) (2014) - [j64]Xiao-Yuan Wang, Zhili Zhou, Ping Ji, Ji-Bo Wang:
Parallel machines scheduling with simple linear job deterioration and non-simultaneous machine available times. Comput. Ind. Eng. 74: 88-91 (2014) - [j63]Ji-Bo Wang, Jian-Jun Wang:
Flowshop scheduling with a general exponential learning effect. Comput. Oper. Res. 43: 292-308 (2014) - [j62]Na Yin, Liying Kang, Ping Ji, Ji-Bo Wang:
Single machine scheduling with sum-of-logarithm-processing-times based deterioration. Inf. Sci. 274: 303-309 (2014) - [j61]Ji-Bo Wang, Jian-Jun Wang:
Single machine group scheduling with time dependent processing times and ready times. Inf. Sci. 275: 226-231 (2014) - [j60]Xue-Ru Wang, Ji-Bo Wang, Jian Jin, Ping Ji:
Single machine scheduling with truncated job-dependent learning effect. Optim. Lett. 8(2): 669-677 (2014) - [j59]Ji-Bo Wang, Jian-Jun Wang:
Single machine scheduling with sum-of-logarithm-processing-times based and position based learning effects. Optim. Lett. 8(3): 971-982 (2014) - [j58]Ping Ji, Gang Li, Yunzhang Huo, Ji-Bo Wang:
Single-machine common flow allowance scheduling with job-dependent aging effects and a deteriorating maintenance activity. Optim. Lett. 8(4): 1389-1400 (2014) - 2013
- [j57]Ji-Bo Wang, Ming-Zheng Wang:
Makespan Minimization on Three-Machine Flow shop with deteriorating jobs. Asia Pac. J. Oper. Res. 30(6) (2013) - [j56]Xiaoqing Zhang, Linyan Sun, Ji-Bo Wang:
Single machine scheduling with autonomous learning and induced learning. Comput. Ind. Eng. 66(4): 918-924 (2013) - [j55]Ji-Bo Wang, Ming-Zheng Wang:
Minimizing makespan in three-machine flow shops with deteriorating jobs. Comput. Oper. Res. 40(2): 547-557 (2013) - [j54]Xiao-Yuan Wang, Zhili Zhou, Xi Zhang, Ping Ji, Ji-Bo Wang:
Several flow shop scheduling problems with truncated position-based learning effect. Comput. Oper. Res. 40(12): 2906-2929 (2013) - [j53]Ji-Bo Wang, Xiao-Yuan Wang, Linhui Sun, Linyan Sun:
Scheduling jobs with truncated exponential learning functions. Optim. Lett. 7(8): 1857-1873 (2013) - 2012
- [j52]Ji-Bo Wang, Ming-Zheng Wang, Ping Ji:
Scheduling Jobs with Processing times Dependent on Position, Starting Time, and Allotted Resource. Asia Pac. J. Oper. Res. 29(5) (2012) - [j51]Ji-Bo Wang, Ming-Zheng Wang:
Single-machine scheduling to minimize total convex resource consumption with a constraint on total weighted flow time. Comput. Oper. Res. 39(3): 492-497 (2012) - [j50]Ming-Zheng Wang, Ji-Bo Wang:
Single-machine makespan minimization scheduling with nonlinear shortening processing times. Comput. Oper. Res. 39(3): 659-663 (2012) - [j49]Ji-Bo Wang, Ming-Zheng Wang, Ping Ji:
Single machine total completion time minimization scheduling with a time-dependent learning effect and deteriorating jobs. Int. J. Syst. Sci. 43(5): 861-868 (2012) - [j48]Ji-Bo Wang, Yu-Bin Wu, Ping Ji:
A revision of some single-machine and m-machine flowshop scheduling problems with learning considerations. Inf. Sci. 190: 227-232 (2012) - [j47]Ji-Bo Wang, Mingzheng Wang:
Worst-case analysis for flow shop scheduling problems with an exponential learning effect. J. Oper. Res. Soc. 63(1): 130-137 (2012) - [j46]Ji-Bo Wang, Ming-Zheng Wang:
Single-machine scheduling with nonlinear deterioration. Optim. Lett. 6(1): 87-98 (2012) - [j45]Ji-Bo Wang, Ping Ji, T. C. E. Cheng, Dan Wang:
Minimizing makespan in a two-machine flow shop with effects of deterioration and learning. Optim. Lett. 6(7): 1393-1409 (2012) - 2011
- [j44]Shu-Hui Yang, Ji-Bo Wang:
Minimizing total weighted completion time in a two-machine flow shop scheduling under simple linear deterioration. Appl. Math. Comput. 217(9): 4819-4826 (2011) - [j43]Ji-Bo Wang, Cai-Min Wei:
Parallel machine scheduling with a deteriorating maintenance activity and total absolute differences penalties. Appl. Math. Comput. 217(20): 8093-8099 (2011) - [j42]Ji-Bo Wang, Ming-Zheng Wang:
Worst-case behavior of simple sequencing rules in flow shop scheduling with general position-dependent learning effects. Ann. Oper. Res. 191(1): 155-169 (2011) - [j41]Xue Huang, Ming-Zheng Wang, Ji-Bo Wang:
Single-machine group scheduling with both learning effects and deteriorating jobs. Comput. Ind. Eng. 60(4): 750-754 (2011) - [j40]Ji-Bo Wang, Jian-Jun Wang:
Single-machine scheduling jobs with exponential learning functions. Comput. Ind. Eng. 60(4): 755-759 (2011) - [j39]Xiao-Yuan Wang, Ming-Zheng Wang, Ji-Bo Wang:
Flow shop scheduling to minimize makespan with decreasing time-dependent job processing times. Comput. Ind. Eng. 60(4): 840-844 (2011) - [j38]C. T. Ng, Ji-Bo Wang, T. C. Edwin Cheng, Sze Sing Lam:
Flowshop scheduling of deteriorating jobs on dominating machines. Comput. Ind. Eng. 61(3): 647-654 (2011) - [j37]Xiao-Yuan Wang, Li-Yan Wang, Ji-Bo Wang:
Erratum to "Single machine scheduling problems under the effects of nonlinear deterioration and time-dependent learning" [Math. Comput. Modelling 50 (2009) 401-406]. Comput. Math. Appl. 61(5): 1471-1473 (2011) - [j36]Xiao-Yuan Wang, Li-Yan Wang, Ji-Bo Wang:
Erratum to "Notes on "Single machine scheduling problems under the effects of nonlinear deterioration and time-dependent learning" [Math. Comput. Modelling 50 (2009) 401-406]" [CAMWA 61/5 (2011) 1471-1473]. Comput. Math. Appl. 61(10): 3180 (2011) - [j35]Quan Liao, Ji-Bo Wang, Ian A. Watson:
Accelerating Two Algorithms for Large-Scale Compound Selection on GPUs. J. Chem. Inf. Model. 51(5): 1017-1024 (2011) - [j34]Linhui Sun, Linyan Sun, Ji-Bo Wang:
Single-machine scheduling to minimize total absolute differences in waiting times with deteriorating jobs. J. Oper. Res. Soc. 62(4): 768-775 (2011) - [j33]Ji-Bo Wang, Jian-Ji Wang, Ping Ji:
Scheduling jobs with chain precedence constraints and deteriorating jobs. J. Oper. Res. Soc. 62(9): 1765-1770 (2011) - [j32]Jian-Jun Wang, Ji-Bo Wang, F. Liu:
Parallel machines scheduling with a deteriorating maintenance activity. J. Oper. Res. Soc. 62(10): 1898-1902 (2011) - [j31]Ji-Bo Wang, Ming-Zheng Wang:
A revision of machine scheduling problems with a general learning effect. Math. Comput. Model. 53(1-2): 330-336 (2011) - 2010
- [j30]Ji-Bo Wang, Dan Wang, Guo-Dong Zhang:
Single-machine scheduling with learning functions. Appl. Math. Comput. 216(4): 1280-1286 (2010) - [j29]Xue Huang, Ji-Bo Wang, Li-Yan Wang, Wen-Jun Gao, Xue-Ru Wang:
Single machine scheduling with time-dependent deterioration and exponential learning effect. Comput. Ind. Eng. 58(1): 58-63 (2010) - [j28]Dan Wang, Ming-Zheng Wang, Ji-Bo Wang:
Single-machine scheduling with learning effect and resource-dependent processing times. Comput. Ind. Eng. 59(3): 458-462 (2010) - [j27]Ji-Bo Wang, Linhui Sun, Linyan Sun:
Scheduling jobs with an exponential sum-of-actual-processing-time-based learning effect. Comput. Math. Appl. 60(9): 2673-2678 (2010) - [j26]Ji-Bo Wang, Ming-Zheng Wang:
Single machine multiple common due dates scheduling with learning effects. Comput. Math. Appl. 60(11): 2998-3002 (2010) - [j25]C. T. Ng, Ji-Bo Wang, T. C. Edwin Cheng, L. L. Liu:
A branch-and-bound algorithm for solving a two-machine flow shop problem with deteriorating jobs. Comput. Oper. Res. 37(1): 83-90 (2010) - [j24]Linhui Sun, Linyan Sun, Kai Cui, Ji-Bo Wang:
A note on flow shop scheduling problems with deteriorating jobs on no-idle dominant machines. Eur. J. Oper. Res. 200(1): 309-311 (2010) - [j23]Ji-Bo Wang:
Single-machine scheduling with a sum-of-actual-processing-time-based learning effect. J. Oper. Res. Soc. 61(1): 172-177 (2010) - [j22]Ji-Bo Wang:
Response to Viewpoint on 'Single-machine with a sum-of-actual-processing-time-based learning effect'. J. Oper. Res. Soc. 61(2): 355 (2010)
2000 – 2009
- 2009
- [j21]Ji-Bo Wang, Li-Li Liu:
Two-machine flow shop scheduling with linear decreasing job deterioration. Comput. Ind. Eng. 56(4): 1487-1493 (2009) - [j20]Ji-Bo Wang, Li-Li Liu:
Two-machine flow shop problem with effects of deterioration and learning. Comput. Ind. Eng. 57(3): 1114-1121 (2009) - [j19]Ji-Bo Wang:
Single-machine scheduling with learning effect and deteriorating jobs. Comput. Ind. Eng. 57(4): 1452-1456 (2009) - [j18]Ji-Bo Wang, Dan Wang, Li-Yan Wang, Lin Lin, Na Yin, Weiwei Wang:
Single machine scheduling with exponential time-dependent learning effect and past-sequence-dependent setup times. Comput. Math. Appl. 57(1): 9-16 (2009) - [j17]Ji-Bo Wang:
Single machine scheduling with decreasing linear deterioration under precedence constraints. Comput. Math. Appl. 58(1): 95-103 (2009) - [j16]Quan Liao, Ji-Bo Wang, Yue W. Webster, Ian A. Watson:
GPU Accelerated Support Vector Machines for Mining High-Throughput Screening Data. J. Chem. Inf. Model. 49(12): 2718-2725 (2009) - [j15]Ji-Bo Wang:
Single machine scheduling with a time-dependent learning effect and deteriorating jobs. J. Oper. Res. Soc. 60(4): 583-586 (2009) - 2008
- [j14]Ji-Bo Wang:
Erratum to: A note on flow shop scheduling problems with a learning effect on no-idle dominant machines [Appl. Math. Computation 184 (2007) 945-949]. Appl. Math. Comput. 202(2): 897-898 (2008) - [j13]Ji-Bo Wang:
Single-machine scheduling with past-sequence-dependent setup times and time-dependent learning effect. Comput. Ind. Eng. 55(3): 584-591 (2008) - [j12]Ji-Bo Wang:
Single-machine scheduling with general learning functions. Comput. Math. Appl. 56(8): 1941-1947 (2008) - [j11]Ji-Bo Wang, C. T. Ng, T. C. Edwin Cheng:
Single-machine scheduling with deteriorating jobs under a series-parallel graph constraint. Comput. Oper. Res. 35(8): 2684-2693 (2008) - 2007
- [j10]Ji-Bo Wang, T. C. Edwin Cheng:
Scheduling Problems with the Effects of deterioration and Learning. Asia Pac. J. Oper. Res. 24(2): 245-261 (2007) - [j9]Ji-Bo Wang:
Flow shop scheduling problems with decreasing linear deterioration under dominant machines. Comput. Oper. Res. 34(7): 2043-2058 (2007) - [j8]Ji-Bo Wang, Zun-Quan Xia:
Single machine scheduling problems with controllable processing times and total absolute differences penalties. Eur. J. Oper. Res. 177(1): 638-645 (2007) - 2006
- [j7]Ji-Bo Wang:
Single machine scheduling with common due date and controllable processing times. Appl. Math. Comput. 174(2): 1245-1254 (2006) - [j6]Ji-Bo Wang, C. T. Daniel Ng, T. C. Edwin Cheng, Li-Li Liu:
Minimizing total completion time in a two-machine flow shop with deteriorating jobs. Appl. Math. Comput. 180(1): 185-193 (2006) - [j5]Ji-Bo Wang, Feng Shan, Bo Jiang, Li-Yan Wang:
Permutation flow shop scheduling with dominant machines to minimize discounted total weighted completion time. Appl. Math. Comput. 182(1): 947-954 (2006) - [j4]